Q11.
It takes 3 painters 2 days to complete a job. Work out how long 1 painter would take.

Respuesta :

26liujiaying
26liujiaying 26liujiaying
  • 03-02-2021

Answer:

6

Step-by-step explanation:

1 painter is 1/3 of 3 painters, so the answer is 2 x 3=6

Hope I helped!

Answer Link

Otras preguntas

The length of a diagonal of a cube with edge length 25cm
Write a system of equations with a solution (4,–3)
The value square root of 53 of lies between which two consecutive integers?
Can somoene help me with this question??How might the history of the U.S. have been different if the original thirteen states had been guaranteed a perpetual ma
Write a system of equations with a solution (4,–3)
Explain how a species can evolve through natural selection.
If a slope of a line is 2/0 is it 0 or undefined?
Explain how a species can evolve through natural selection.
If 8 men can chop down 28 trees in one day, how many trees can 20 men chop down in one day?
Explain how a species can evolve through natural selection.