To complete a job a crew of 8 people needs 18 days. How long will the same job be finished if the crew will have 9 people?

Respuesta :

rockyrules789 rockyrules789
  • 01-11-2019

Answer:

16

Step-by-step explanation:

.

Answer Link
lajfoaofje lajfoaofje
  • 27-06-2020

Answer:

16

Step-by-step explanation:

Answer Link

Otras preguntas

Which political parties are currently recognized by the state of Louisiana? Check all that apply. U Democratic Republican Green Libertarian O Reform Know-Nothin
Point B, located at (6, 3), is reflected across the y-axis. What are the coordinates of the reflected point? A. (6, 3) B. (-6, -3) C. (6, -3) D. (-6, 3)
For an A.P. ,The first two term are -3, 4. The 21st term is
Ms. Thomas has a class of 16 students. She can spend 24 on each student to buy math supplies for the year. She first buys all of her students calculators, which
the circle from problem six is in the corner!
Help!!!! Which locations would be considered a target hazard? mailbox unit on a highway city baseball field bus or train station neighborhood playground
Daisy Buchanan 1 connection or comparisons to someone in modern society
When did the battle take place? 1862 o 1817 O 2012 1579
HELP BEEG BRAINS REQUIRED NO TROLLS OR LINKS OR I REPORT 2. Read the following excerpt from the "I Have a Dream" speech and decide if it uses a rhetorical appea
what does the medical community recommend to prevent obesity